2011 Parking Lot Painting Schedule

Completed: August 2011

The majority of parking areas on campus are striped on a three-year rotation. Painting is scheduled in two-week time periods to allow for striping to take place in smaller sections and to also allow for rain days. Parking areas that are being painted are generally shut down for two to three hours, but may take longer due to weather conditions such as temperature and humidity, which can cause the paint to dry slower. Painting crews begin work at 5 a.m., and spaces are left available whenever possible. Campus visitors and employees are asked to refrain from moving cones or parking in spaces that are being painted or that have been recently painted so as not to inhibit the painting crew.

Below are the approximate dates in which parking areas will be occupied for painting:

June 1 - June 10

  • Lot 1 - Snyder/Phillips Halls
  • Lot 6 - MSU Museum
  • Lot 11 - Main Library
  • Lot 11 - Olds Hall
  • Wells Hall
  • Lot 10 - Bessey Lot

June 13 - June 24

  • Lot 2 - Mason/Abbott Halls
  • Lot 7 - Agriculture Hall
  • Lot 94 - Spartan Village Daycare
  • Physics - Astronomy Building
  • Psychology Building

June 27 - July 8

  • Olin Health Center
  • Lot 3 - Berkey Hall
  • Lot 8 - Student Services
  • Lot 65 - Brody Neighborhood

July 11 - July 22

  • Lot 4 - Human Ecology Building
  • Lot 9 - Giltner Hall
  • Transportation Services
  • Lot 5 - Williams/Campbell Halls

June 1 - July 29

  • Ramp 2 (Lot 12) – Bessey*
  • Ramp 6 (Lot 103) – Grand River*
  • Spartan Village
  • Lot 89 - Student storage “Y”( west side)
  • Off-bay parking  (north campus)

* There will be intermittent closures within ramps, not complete closures, and only one ramp will be worked on at a time.

 Any lots on the list above that are not finished will go to the next painting year.

Questions, comments, concerns?

Landscape Services contacts:

Kim Consavage, kconsavage@pplant.msu.edu, 517-355-7750
Tracy Harris, tharris@pplant.msu.edu, 517-355-7750

  • Construction Home
  • Projects
  • Detours
  • Listserv
  • Construction Junctions
©2013 Michigan State University Board of Trustees.
MSU is an affirmative-action, equal-opportunity employer.
East Lansing MI 48824