ARCHIVED PROJECTS

Cyclotron Building - New High-Bay Addition
Cyclotron Building - New High-Bay Addition

COMPLETED November 2012

The planning of this project includes an extension at the east end of the existing National Superconducting Cyclotron Laboratory (NSCL) main crane bay and a new experimental systems crane bay north of the new main crane structure and east of the low-energy experimental research addition area.

Read More
East Circle Drive Reconstruction
East Circle Drive Reconstruction - Phase I

COMPLETED February 2013

This project will reconstruct East Circle Drive from Farm Lane to Berkey Hall, located in the North Academic District.

Read More
Eli and Edythe Broad Art Museum
Eli and Edythe Broad Art Museum

COMPLETED

The Eli and Edythe Broad Art Museum will be located on the corner of Grand River Avenue and Farm Lane at the Collingwood campus entrance in the North Academic District. The museum will include three levels totaling approximately 46,000 square feet.

Read More
Emmons Hall Renovation
Emmons Hall Renovation

COMPLETED December 2012

Emmons Hall was located on the west side of Harrison Road in the southeast corner of the Brody Complex in the Residential District. The renovation project included major mechanical, electrical and ventilation upgrades and replacements within the building.

Read More
Engineering Research Complex Addition
Engineering Research Complex - Office Addition

COMPLETED May 2012

The Engineering Research Complex building has a demand for new additional office space located in close proximity to the Energy and Automotive Research Lab (EARL). The enclosion of the walkway, now connecting the two buildings, will provide a permanent connection and increase opportunities for collaborative research between both departments.

Read More
Erickson Hall Renovations
Erickson Hall — Exterior Restoration

COMPLETED October 2009

The existing aluminum curtain wall, glazing system, and doors had become outdated. They were replaced with new energy-efficient aluminum curtain walls and glazing system.

Read More
More Results:
  • « Prev
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • Next »
  • Construction Home
  • Projects
  • Detours
  • Listserv
  • Construction Junctions
©2013 Michigan State University Board of Trustees.
MSU is an affirmative-action, equal-opportunity employer.
East Lansing MI 48824