Main Content
Link to Michigan State University Home Page
MSU Construction IPF Home
  • Construction Home
  • Projects
  • Detours
  • Listserv
  • Construction Junctions

Project Status

  • Planning/Design
  • Construction
  • Archived
  • Construction Home
  •  » Projects

Projects

ARCHIVED PROJECTS

McDonel Hall - River Trail Neighborhood Engagement Center
McDonel Hall - River Trail Neighborhood Engagement Center

COMPLETED

This project aims to transform a cluster of residence halls into a neighborhood, where students in those halls discover and create their own community in a setting that provides innovative and integrated support services located right where they live and leam.

Read More
Michigan State Police Post Demolition
Michigan State Police Post Demolition

COMPLETED

Michigan State University leased property on Harrison Road to the State of Michigan for use as the Michigan State Police headquarters. The Michigan State Police has now relocated its headquarters, and the State of Michigan is in the process of returning the Harrison Road property to MSU.

Read More
Music Building - Auditorium Renovations
Music Building - Auditorium Renovations

COMPLETED

The Music Building auditorium renovation is one component of the overall strategy to provide proper and sufficient space to carry out the instruction and performance needs of the College of Music. This renovation, coupled with the upgrades to Fairchild Theatre that the Board of Trustees authorized for planning in November 2010, will make significant progress toward addressing the performance facility needs of the college.

Read More
Music Building - Replace Electrical Substation
Music Building - Replace Electrical Substation

COMPLETED June 2014

The Music Building is located on West Circle Drive across from IM Sports Circle. The electrical system needs to be upgraded. The upgrade will provide a double-ended electrical service to this building. This double-ended sub-station will be fed by two circuits. If there is a circuit failure, the other circuit can provide service to the facility without a power outage.

Read More
Old College Field Phase III
Old College Field — Phase lll — Baseball

COMPLETED October 2012

This project involved improving the 2,500-seat grandstand and press box for baseball. Site amenities now include brick columns and fascia, and ornamental iron fencing — all matching the complex design palette established in Phases I and II.

Read More
Old College Field Phase VI
Old College Field Phase VI - Softball Grandstand and Press Box

COMPLETED

The project involved the renovation of the softball facility, including the construction of a new press box with an elevator, barrier-free ramps and seating; related utility improvements; salvaging existing bleachers; a new public address system; walkways, fencing and backstop; and site restoration.

Read More
More Results:
  • « Prev
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • Next »
  • Construction Home
  • Projects
  • Detours
  • Listserv
  • Construction Junctions
©2013 Michigan State University Board of Trustees.
MSU is an affirmative-action, equal-opportunity employer.
East Lansing MI 48824