Emergency Steam Tunnel Repairs near Music Building




Description: The project area is located just south of the Music Building on East Circle Drive. Due to some tunnel deterioration (approximate age is over 90 years old), the steam tunnels in this area are in need of repair. Replacement of the tunnels is not feasible at this time, so temporary minor repairs will be done. 

Impacts to pedestrians, bikers, motorists: Both lanes of East Circle Drive are eastbound; the right lane is expected to remain open during the project. Access to the Music Building and Music Practice Building loading dock area is expected to be available during construction with minimum access impacts.   
 
Timeline: The project is expected to begin in late May 2011 and will run through Aug. 19, 2011.
 
Questions, comments, concerns?
 
Design representative: Scott Gardner, mgardner@pplant.msu.edu, 517-432-0782
Construction representative: Andy Linebaugh, alinebau@pplant.msu.edu, 517-432-7103
 
  • Construction Home
  • Projects
  • Detours
  • Listserv
  • Construction Junctions
©2013 Michigan State University Board of Trustees.
MSU is an affirmative-action, equal-opportunity employer.
East Lansing MI 48824