Description: Ramps 1 (Shaw Lane), 2 (Auditorium Road), 3 (Wharton Center) and 5 (Trowbridge Road) will remain open while construction takes place, with some parking impacts as work progresses through the levels. Ramps 1, 3, and 5 underwent concrete restoration, traffic coating and expansion joints repair. In Ramp 2, stairwells were repaired.
Timeline: Construction began in June 2009, and was substantially completed in August 2009.