T.B. Simon Power Plant - Sorbent Injection for Boilers 1, 2, and 4

In-Planning/Design
December 2011 - December 2012

Description: Michigan State University continues to pursue cleaner energy options and reduction of emissions from the T.B. Simon Power Plant. New studies indicate that sorbent injection can be an effective and relatively low-cost means to lower emissions from solid fuel combustion.

The planning of this project is anticipated to include further investigation of the installation of sorbent injection systems to remove unwanted emissions from the present boiler system. Sorbent injection uses a receiving and pneumatic piping system to inject a dry alkaline (calcium) reagent into the ash collection system of the boilers (baghouse). This process reduces emissions created by solid fuel combustion. It is expected that this emission reduction system will satisfy the newest EPA requirements for industrial boilers.

The T.B. Simon Power Plant is located on Service Road in the Service District.

Questions, comments, concerns?

Project Representative: Kevin Durkin, kdurkin@pplant.msu.edu, 517-432-2153

  • Construction Home
  • Projects
  • Detours
  • Listserv
  • Construction Junctions
©2013 Michigan State University Board of Trustees.
MSU is an affirmative-action, equal-opportunity employer.
East Lansing MI 48824